#P2970. The lazy programmer

    ID: 1980 远端评测题 5000ms 64MiB 尝试: 0 已通过: 0 难度: (无) 上传者: 标签>Northeastern Europe 2004, Western Subregion

The lazy programmer

Description

A new web-design studio, called SMART (Simply Masters of ART), employs two people. The first one is a web-designer and an executive director at the same time. The second one is a programmer. The director is so a nimble guy that the studio has already got N contracts for web site development. Each contract has a deadline di.

It is known that the programmer is lazy. Usually he does not work as fast as he could. Therefore, under normal conditions the programmer needs bi of time to perform the contract number i. Fortunately, the guy is very greedy for money. If the director pays him xi dollars extra, he needs only (biai xi) of time to do his job. But this extra payment does not influent other contract. It means that each contract should be paid separately to be done faster. The programmer is so greedy that he can do his job almost instantly if the extra payment is (biai) dollars for the contract number i.

The director has a difficult problem to solve. He needs to organize programmer’s job and, may be, assign extra payments for some of the contracts so that all contracts are performed in time. Obviously he wishes to minimize the sum of extra payments. Help the director!

Input

The first line of the input contains the number of contracts N (1 ≤ N ≤ 100 000, integer). Each of the next N lines describes one contract and contains integer numbers ai, bi, di (1 ≤ ai, bi ≤ 10 000; 1 ≤ di ≤ 1 000 000 000) separated by spaces.

Output

The output needs to contain a single real number S in the only line of file. S is the minimum sum of money which the director needs to pay extra so that the programmer could perform all contracts in time. The number must have two digits after the decimal point.

2
20 50 100
10 100 50
5.00

Source

Northeastern Europe 2004, Western Subregion